Turning of the hull for one of the three (3) pilot boats ordered by the Tanzania Ports Authority (TPA)
Tandem lift!
Successful turning of the hull for one of the three (3) pilot boats ordered by the Tanzania Ports Authority (TPA) over the weekend.
All is set for its second stage of construction at our shipyard in Mombasa.
- YEAR 2020
- WE DID Heavy Lifting
- CATEGORY Heavy Lifting
- TAGS Heavy Lifting