One hundred and twenty (120) bored cast in situ piles of 600 mm diameter

Installation of one hundred and twenty (120) bored cast in situ piles of 600 mm diameter with an average depth of 10.0m in 15 working days for construction of the ultra-modern Mombasa Stadium.