66m Steel pipe bridge
We successfully delivered a 66m steel pipe bridge to our client, Base Titanium Limited in Kwale.
The bridge consisting of 3 spans – 21.73m, 22.40m, 21.73m – will be assembled on‐site via splice connections and lifted into position as a full span once all the sections are delivered.
- CLIENT Base Titanium
- YEAR 2018
- WE DID 66m Steel pipe bridge