We successfully delivered a 22.40m span of a steel pipe bridge to our client, Base Titanium Limited in Kwale.
The 66m bridge consisting of 3 spans – 21.73m, 22.40m, 21.73m – will be assembled onāsite via splice connections and lifted into position as a full span once all the sections are delivered.